A resurface of a ramp built 3+ years ago. | |
Old ramp deck removed, new deck applied. | |
End of ramp redone with more material making the surface stiffer. | |
Some of the foot rails replaced, all raised an additional 2 inches. | |
Deck in place, foot rails about to be applied. | |
Ramp finished, silicone caulk sealing cracks and allowed to dry. | |
Pre-paint. | |
Ramp
deck painted in about 50 minutes.
Ramp's
total deck surface: 27'
|
|